Lucas Primary School

Siena Catholic Primary School is the first school for the Lucas area. The school received $3 million in funding for design and construction of Stage 1.

The school site is 3ha and is positioned on the north side of the education precinct and in total the education and recreation precinct makes up 17 hectares.

The builders for this project were Swan Build and Searle Brothers.

Stage 1 included two buildings comprising of general learning areas, site works including a synthetic turf, and infrastructure. Stage 1A, a permanent modular facility, was completed in December 2016, allowing the school to open in Term 1, 2017.

Moddex was able to supply the client with balustrading for the east, west and south decks to ensure the safety of students. 

Stage 1B of the project is the construction of a second modular building. This building will be delivered by August and finished in November 2017.

Project Details

Builder Swanbuild
Electrical Wholesaler AWM Echuca
Completed December 2016

Learn More about Us
Our Company Profile

Decrolux Company Profile 2018 Call Us